What are construction plans called?

What are construction plans called?

One set of plans is called the construction set, and it remains on-site throughout the construction process. They guide the actual construction administration, usually under the direction of a general contractor.

How many types of construction plans are there?

There are 8 main types of construction drawings included in a set of commercial blueprints. The same types of drawings also appear in residential construction, but their scope and specific contents will differ.

What are the main types of drawings used in construction?

Top 10 most common types of Construction drawings use regularly in construction industries.

  • Block Plan.
  • Architectural Drawings.
  • Production Drawings.
  • Structural Drawings.
  • Electrical drawings.
  • Plumbing Drawings.
  • HVAC Drawings.
  • Firefighting Drawings.

How many types of construction drawings are there?

Different types of drawings is used in construction such as architectural drawings, structural, electrical, plumbing and finishing drawings. These drawings provides layout plans and details for construction of each and every part of the building.

What is Type 2 B construction?

TYPE II-B–Unprotected Non-Combustible (Most common type of non-combustible construction used in commercial buildings). Building constructed of non-combustible materials but these materials have no fire resistance.

What are the different types of building plans?

Different Types of Building Plans. 1 1. Site Plan. Site plan is comprehensive detailed drawing of the building or an apartment representing whole plan of a building. It shows property 2 2. Floor Plan. 3 3. Cross Section. 4 4. Elevation. 5 5. Landscape Plans.

What are the different types of construction management plans?

3 Types of Construction Management Plans 1 A CMP Starts off With the End in Mind. The best plans are plans made with the finished construction in mind. 2 Business Plan. The larger the project, the more this “business plan” CMP becomes necessary. 3 Project Management. 4 Building Site.

What is a construction set of plans?

One set of plans is called the construction set, and it remains on-site throughout the construction process. They guide the actual construction administration, usually under the direction of a general contractor.

What should be included in a construction project plan?

Discuss all the permits and other legal requirements that the construction management needs to get and acquire to ensure its smooth operations. Particular construction documents, simple agreements, and contracts must also be reviewed and listed in the construction project plan. 3.